Commercial

Healthy Frenchy’s Juice Bar

Project date

5/25/23

Address

127 East 102nd Street

Type of work

Kitchen and Storage

The challenge was to create an NYC Department of Health compliant kitchen in the cellar of a pre-war building.

ZDR managed a full gut restoration of an existing cellar to the first floor of Healthy Frenchy’s. The project allowed for on-site preparation, refrigeration, and storage which allowed Healthy Frenchy’s to expand their operations.

Mold Remediation | MEP Demo and Reinstall | Cellar to Main Floor Staircase Installation | Carpentry & Painting | Refrigeration | Oven | Stove | Ventilation

General Contractor: ZDR | Architect: Grupo Design, LLC | Photos: Joe Soonthornsowad

Next
Next

Project Two